Bielski performed all restoration cleaning on the underside of the Mosai cantilever pads, comprised of heavy exposed aggregate finish which accumulated atmospheric dirt staining.

Bielski, utilizing a 2 part chemical cleaning process, restored the appearance while collecting all waste water, which was contained by erecting dykes and utilizing transfer pumps to transport the water to a central location to facilitate filtering and disposal.

Are you interested in a similar service for your project?

Full name
Please enter your name

E-mail(*)
is not a valid e-mail address.

Contact Phone
Please enter a valid phone number

Additional information
Please include additional information

Antispam(*)
Invalid Input

Similar Pages

Chester Williams Building

Chester Williams is located at the intersection of 5th and Spring streets

Santa Fe Lofts Bielski performed all loose and flakey lead based abatement at all exterior elevations
Museum of Natural History

Its distinctive main building, with fitted marble walls and domed and colonnaded rotunda, is on the National Register of Historic Places

Back to top